AI swim coach · iPhone & Apple Watch

Most swim apps count laps.
SwimAI watches you swim.

Film one length from the deck. SwimAI tracks your body frame by frame, measures your stroke, names the one fault costing you speed, and writes your training week around fixing it.

First month free · Built with a competitive swim coach · Answers in under a minute
SwimAI tracking Strokes L 0 · R 0
Level 4.5 / 5 · 47.7 strokes/min Tracking: on
How it works

From one length to a whole week.

1

Film one length

Prop your phone on the deck and swim past it. Any pool, any phone. No wearable, no markers.

2

Get the read

17 body points tracked on every frame. Your level, stroke rate, stroke count, speed, distance per stroke, and the faults that matter.

3

Train the fix

Kai, your coach, builds your sessions around that fix: warm-up, drill, main set, cool-down, with the why and the cue for each.

Live demos

Two real swimmers. Two real analyses.

Not mockups. Each clip went through the same pipeline the app uses today, with the overlay, the numbers, the plan and Kai's answer exactly as they came back.

Inside the app

See it on your iPhone.

Analysis, your week, Kai, progress and Apple Watch: the screens from the App Store listing.

SwimAI: Swim Coach & Analysisapps.apple.com · View on the App Store →
Today screen with an analysed swim Analysis screen with AI pose tracking, strokes and stroke rate Progress charts Chat with Kai, the AI coach Health and recovery Leaderboards Swim together Live session on Apple Watch Foundations course for new swimmers Drill how-to with video
Everything in one app

A coach on deck, on your wrist, in your pocket.

🎥

Video analysis

Frame-by-frame body tracking, stroke timing for each arm, level, speed and the fault to fix first.

🗓️

A plan that's yours

Weekly sessions built from your film, your level, your goal and your gear. Miss a week and it adapts.

💬

Kai, your coach

Ask anything. Kai has seen your swims and your plan, and answers like a coach on deck.

⌚

Apple Watch

Sessions on your wrist: reps advance on wall touches, with live heart-rate zones, rest timers and pace.

Start today

Your next length could be your best one.

Download SwimAI, film one length, and see what a coach would see. The first month is free.